商品代碼:3454354

  • 現在位置: 首頁 » 貨源 » 機械設備 » 粉碎設備 » 砂磨機 »
    供應FSW-2實驗室棒銷砂磨機
    商品代碼: 3454354
    (可點擊以下立即詢價直接線上諮詢,或來電提供此商品代碼諮詢)
    即日起提供日本樂天代購服務-詳見 Rakuten-suki日本樂天代購,謝謝。
    商品詳細說明











     

    Model:ZSJ-890

    Double Shaft Mixer Machine

     

     

     

     

     

     

     

    instructions

     

     

     

     

     

     

     

     

     

    張傢港市通惠化工機械有限公司 

    ZHANGJIAGANGCITYTonGHUI CHEMICAL MACHINERY CO.LTD

     

     

     

    Catalog

    1. Summarize………………………………………………..( 1 )
    2. Main data…………………………………………………( 1 )
    3. Structure and capability…………………………………..( 1 )
    4. Installation and debugging………………………….........( 2 )
    5. Use and maintenance…………………………………....( 2~3 )

    Table of Hydraulic pressure component and parts that easily lose………………………………………………………….( 4 )

    Attach:

    1、    structure diagram…………………………………( 5 )

    2、    basic  chart………………………………………( 6 )

    3、    principle chart of electric machine………. ………( 7 )

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    1. summarize

    Double shaft mixer machine is the new type of high efficient mixer machine. It applies to churning up high viscoidal material, originated at home.

    This machine has high speed axis and low speed axis, the mixer of the low speed axis make the material turn up and down in the canister. Collision and cutting are caused by the dentiform lamina of high speed axis and the material, which make congeries damage separate rapidly, blend equably, speed up melting. Plasm pumped when it turns around, and the material in it will reach to blend fully and disperse. It is widely used in the field of chemical products such as dope, printing ink, food, pigment and so on..

    2. main data

      1. high speed electric machine     YB180L-4-37KW440V×60Hz

       2. low speed electric machine    YB180L-4-17/26KWmatch with XLD8185-11 retarder

       3. diameter of dispersive lamina           φ280mm

       4. diameter of mixer                    φ860mm

       5.rotate speed of high speed axis            0-1440rpm, frequency conversion timing

       6. rotate speed of low speed axis              60/120rpm

       7. max raise distance                        950mm

       8. vacuum device         vacuum pump XD040, vacuum degree≤-0.08MPa

       8. cubage of canister body                    500L

       9. oil pump electric machine                  2.2KW

    10. the weight of mainframe                3000kg

    11. size of shape(lengthXwidthXheight)  2695×1300×3400mm

     

    1.  Structure and capability

      Structure: It contains seven sections: hydraulic pressure elevate,  wheel box, high speed mixer axis, clamp device, mixer canister, hydraulic pressure system, electric control box

    Capability:(1) Stand pole lift smoothly, neatly. It has the protector of overall valve, safe and reliable, and operates conveniently

        2In the wheel box, low speed axis is brought driver along retarder, then the driven wheel is brought by strap. The high speed axis and electric machine straight joined drive calmly, reliably, compact structure.

        3Main drive system run smoothly, it has low noise, which are accordance with the standard of environmental protection.

        4Hydraulic pressure system is match with gear pump, that make the good capability of fluid drive

    -1-

     

     

    1. Erection and commissioning

    AErection

         1The basic device should be obligated the hole and obligated to bury the bolt 5-M20400 (80mm taller than the ground), see the detail of basic dimension chart

             2Stand pole that mainframe installs should be vertical by the ground.

             3Oil box installation: capability of explosion protection, it can be located in the explosion district.

             4Electric control box installation: it adopts starting up directly, occuring little spark. If there is no requirement of fireproofing in the plant, it will be installed directly near the mainframe. If it needs fireproofing and explosion protection in the plant, then it will be installed in the district of non-explosion.

    Bcommissioning

    1. When the oil box is clean, infusing 20#mechanical oil to the plastic oil up level of 2/3 height.

    2. Check clamp between clamp institution and canister

    3. Check the degree of tightness of the triangle adhesive tape

    4. debugging

    (1)   Turn on the power, press raise button(pump electric machine), loose exhaust valve bolt, remove the air then screw it tightly, adjust overfall valve to oil pressure 18kgf/ cm2(1.765MPa)

    (2)   Press raise button, when the vat raise to the max distance, then stop it, check the location of the oil box, it can’t be less than half of the  nether plastic oil level, or it will be supplied oil. Check the leakage in all connective sections and sealed sections, press dro button(electromagnetism smooth valve, make the canister down to the lowest location.

    (3)   After the the churn-up canister at the right position, fix the adjust bolt on the device.

    (4)   According to the height of the load, adjust the time relay, confirm the better to-and-pro  distance. It is required that the max height of raising  guarantee the lamina under the surface of liquid and more than 100mm of the distance of liquid.

    5. Use and maintenance

      Ause

    1Turn on the power, check all the switches, indicator light, button of the control box and voltage.

    -2-

             

    2Fix the churn-up canister tightly, make the tight journey close, switch on the second power, choose the high speed movement and low speed movement, then press the button according to the indicator sign. It can operate .

             3In the course of the operation, if it turns over loading, it will be stopped and check the reasons, when all is right, then continue running.

             4It should be delivered liquid material first however operate normally or production debugging, when immerge the low speed plasm ,it starts the low speed axis, turn around slowly, then enter the solid material. when all the material is in, then adjust the timing machine to the high speed, and start the high speed axis.

             5Operate normally, the charge modulus of the canister is 0.7, about 0.35 m3,scilicet the height of the charge is 560mm, according to the condition of the material, it also can reach the eligible products when it cannot start the to-and-pro operation. But when the charge modulus of the canister is more than 0.7 or join the liquid to the surface of churn-up material , it should start the up-to-pro button, which can make the product even quality.

         6In the course, if it has long time power cut, and it can not start because of the material fall to the increase of normal temperature viscoidal or other reasons such as the deal of solid increases, high viscoidal, overloading, it can lift the plasm above the surface of the liquid, then start the slow speed axis slowly, and the stand pole falls down slowly(manual). When the separated lamina is immerged under the liquid, then start the high speed axis. It can reach the aim of operating normally when the temperature of the material is increasing, the viscoid is falling. And the time of operation is not suitable for long, because of volatilization of solvent.

    7When after work, stop the machine, turn off the general switch, lest that the machine should be damaged.

      Bmaintenance

    1. All transmission part should be often add lube, high speed transmission shaft should be added MoS222#Li-lubricate fatonce a week, low speed transmission shaft should be added ZL4522#Li-lubricate fathalf a year.

              2. oil box should be used 20# mechanical oil, replacing it half a year, and cleaning the oil box. And the sieve should be cleaned once a month, after replacing the oil, it should be cleaned in two or three days.

              3. Communication contact machine should be checked half a year, the device of continuely using for one year, it will be heavy repaired .

             

     

    -3-

     

     

    4. When the device stops for long, it should be cut the power, and clean all the parts of the machine, join the oil to the all lubricate part, it should be anointed and antirust on the principal axis and pole stopper, oriented pole.

     

    chart of roll axletree of device use

    No.

    Name of Axletree

    specifications

    size

    qty

    Use part

    1

    Single line centripetal thrust ball bearing

    36312GB292-64

    60×130×31

    2

    High speed transmission shaft

    2

    Ditto

    36314GB292-64

    70×150×35

    2

    Low speed transmission shaft

    3

    Ditto

    36309GB292-64

    45×100×25

    1

    Initiative bandwheel

    4

    Single line ball bearing

    204GB276-64

    20×47×14

    3

    wheel

    5

    Ditto

    3205GB301-64

    25×47×15

    3

    wheel

     

    hydraulic pressure component chart

    No.

    Name

    specification

    qty

    1

    Oil pump

    CB-B40

    1

    2

    Electromagnetism valve

    ZHF-15

    1

     

    chart of parts that easily lose

    No.

    Name

    Specification

    Qty

    Material

    1

    V shape of rubber sealed circle

    A200×230

    HG4-33T-66

    1-3-1

    Combination batch

    Oil resistant rubber

    I-1

    2

    O shape of sealed circle

    D240×5.7

    GB1235-76

    2

    Oil resistant rubber I-1

    3

    Oil sealed felty circle

    200  FJ145-79

    1

    Oil resistant rubber I-1

    4

    Triangle adhesive tape

    D4500mm

    6

    Shade fabric

    5

    Separated impeller

    φ280mm

    1

    1Cr18Ni9Ti

    6

    J shape oil sealed

    60×85×12

    1

     

    7

    J shape oil sealed

    70×95×12

    1

     

    8

    Mechanism sealed

    152-60

    1

     

    9

    Mechanism sealed

    212-70

    1

     



    新手教學
    供應FSW-2實驗室棒銷砂磨機_砂磨機_粉碎設備_機械設備_貨源_批發一路發
    批發市場僅提供代購諮詢服務,商品內容為廠商自行維護,若有發現不實、不合適或不正確內容,再請告知我們,查實即會請廠商修改或立即下架,謝謝。
    相關商品
    line 線上客服  ID@tsq1489i
    線上客服